1. How long is the delivery time?       According to your greenhouse size and system, the delivery time is usually 10-60days. 2. How long  is the warranty period?       Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year, sunshade net 2-3years, etc. 3. Is your compay foreign trade company or manufacturer?     we are manufacturer. 4. Can you supply sample? 5. Can your company supply greenhouse design?     Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract. 6.  How to intall greenhouse       First we prepare the material and export.       After your customs clearing, we send 2-4 engineers or all workers to guide to install.       If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you. 7. When installing, what cost should we pay?       our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication 8. What is the payment terms?     usually the deposit is 30%-50% of total value. Before loading, all the balance shoulde be paid off. Or you can give your own payment terms, then we can negotiate it. 1. How long is the delivery time?       According to your greenhouse size and system, the delivery time is usually 10-60days. 2. How long  is the warranty period?       Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year, sunshade net 2-3years, etc. 3. Is your compay foreign trade company or manufacturer?     we are manufacturer. 4. Can you supply sample? 5. Can your company supply greenhouse design?     Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract. 6.  How to intall greenhouse       First we prepare the material and export.       After your customs clearing, we send 2-4 engineers or all workers to guide to install.       If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you. 7. When installing, what cost should we pay?       our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication 8. What is the payment terms?     usually the deposit is 30%-50% of total value. Before loading, all the balance shoulde be paid off. Or you can give your own payment terms, then we can negotiate it. Plant Extract, Sap & Extract,Herbal Extract,Fruit Extract Raw Chemical Material, Plant Extract Co., Ltd. , http://www.nbactivepharmaceutical.com
commercial greenhouse main product description:
1.commercial greenhouse main skeleton use hot dip galvanzied ,hot dip galvanized dip galvanized layer 0.06-0.08mm,at least  use 25-30 years
2.commercial greenhouse outside cover,roof cover 8mm PC ,all surround cover 5+6+5 hollow glass.
commercial greenhouse use main technology data:
1.commercial greenhouse load wind:0.45KN/m2
2.commercial greenhouse load snow :0.35KN/m2
3.commercial greenhouse span use length:12m/9.6m/10.8m
3.commercial greenhouse use bay:4m/8m
4.commercial greenhouse use max.discharge water ability:120mm/hr
commercial greenhouse use main system showing:
hot dip galvanized steel pipesÂ
dip galvanzied layer 0.06-0.08mm,at least service life 25 -30 years
 include
commercial greenhouse use outside coverÂ
roof 8mm PC
all surround wall 5+6+5 hollow glassinclude
commercial greenhouse use main ventialtion system
skylight ventilation:2.1m*1m
side windowinclude
commercial greenhouse use reduce temperature system
water curtains and exhaust
fan
this system mainly use water evaporation principle reduce greenhouse inside temperature and humidity
reduce temperature range 4-14ºCinclude
commercial greenhouse use shade system
outside shade system,shade mesh rate 70%
inside shade system,shade meshinclude
greenhouse use soilless cultivation system
 matrix cultivation -coconut bar planting
hydroponic
fog cultivationchoose use
greenhouse use water and fertilizer machineÂ
directly provide crop nurtrient
choose useÂ
other systemÂ
Â
choose use
Â
commercial greenhouse from different Angles see this greenhouse :
commercial greenhouse workshop showing:
greenhouse steel structure material is high quality carbon steel which is accordance with national standard. Steel parts and fasteners are processed according to"GB/T1912-2002 Technical Requirements and Test Methods of Hot-galvanized Layer for Metal Coating Steel Production". Inside and outside hot galvanized steel should meet the national standard (GB/T3091-93) requirements of quality products.
      The cooling system is composed of fan and cooling pad, which can maintain the temperature in the greenhouse at 26-30ºC in summer.
     Heating system has two types, one type is using the boiler to provide heat, and another uses of electric. Boiler fuel can choose coal, oil, gas and bio fuels. Boilers need laying of pipelines and water warming blower to heat. If use electricity, you need electric warm air blower to heat.
    Greenhouse natural ventilation can be opening staggered windows on the roof. Forced ventilation is achieved through installing blowers. In general, we install the cooling system of fans and cooling pad.
commercial greenhouse packing &Â shipping:
commercial greenhouse my RFQ:
CONTACT:
Amanda xiang
mob:+86-15244437166
Â
Â
facebook:xiang wei
Â
Â
commercial greenhouse main product description:
1.commercial greenhouse main skeleton use hot dip galvanzied ,hot dip galvanized dip galvanized layer 0.06-0.08mm,at least  use 25-30 years
2.commercial greenhouse outside cover,roof cover 8mm PC ,all surround cover 5+6+5 hollow glass.
commercial greenhouse use main technology data:
1.commercial greenhouse load wind:0.45KN/m2
2.commercial greenhouse load snow :0.35KN/m2
3.commercial greenhouse span use length:12m/9.6m/10.8m
3.commercial greenhouse use bay:4m/8m
4.commercial greenhouse use max.discharge water ability:120mm/hr
commercial greenhouse use main system showing:
hot dip galvanized steel pipesÂ
dip galvanzied layer 0.06-0.08mm,at least service life 25 -30 years
 include
commercial greenhouse use outside coverÂ
roof 8mm PC
all surround wall 5+6+5 hollow glassinclude
commercial greenhouse use main ventialtion system
skylight ventilation:2.1m*1m
side windowinclude
commercial greenhouse use reduce temperature system
water curtains and exhaust
fan
this system mainly use water evaporation principle reduce greenhouse inside temperature and humidity
reduce temperature range 4-14ºCinclude
commercial greenhouse use shade system
outside shade system,shade mesh rate 70%
inside shade system,shade meshinclude
greenhouse use soilless cultivation system
 matrix cultivation -coconut bar planting
hydroponic
fog cultivationchoose use
greenhouse use water and fertilizer machineÂ
directly provide crop nurtrient
choose useÂ
other systemÂ
Â
choose use
Â
commercial greenhouse from different Angles see this greenhouse :
commercial greenhouse workshop showing:
greenhouse steel structure material is high quality carbon steel which is accordance with national standard. Steel parts and fasteners are processed according to"GB/T1912-2002 Technical Requirements and Test Methods of Hot-galvanized Layer for Metal Coating Steel Production". Inside and outside hot galvanized steel should meet the national standard (GB/T3091-93) requirements of quality products.
      The cooling system is composed of fan and cooling pad, which can maintain the temperature in the greenhouse at 26-30ºC in summer.
     Heating system has two types, one type is using the boiler to provide heat, and another uses of electric. Boiler fuel can choose coal, oil, gas and bio fuels. Boilers need laying of pipelines and water warming blower to heat. If use electricity, you need electric warm air blower to heat.
    Greenhouse natural ventilation can be opening staggered windows on the roof. Forced ventilation is achieved through installing blowers. In general, we install the cooling system of fans and cooling pad.
commercial greenhouse packing &Â shipping:
commercial greenhouse my RFQ:
CONTACT:
Amanda xiang
mob:+86-15244437166
Â
Â
facebook:xiang wei
Â
Â
Commercial Greenhouse Mainly for North America Area
Model NO.: greenhouse-01
Structure: Multi Span Structure
Ventilation System: Skylight Ventilation, Side Window Ventialtion
Reduce Temperature: Water Curtains, Exhaust Fan
Shade System: Outside Shade System, Inside Shade System
Span: 12m/10.8m/9.6m
Bay: 4m/8m
Eave High: 3m-6m
Load Wind: 0.45kn/M2
Trademark: sinobeacon
Transport Package: No Packing
Specification: hot dip galvanzied steel pipes
Origin: Qingzhou
HS Code: 9406900090
Model NO.: greenhouse-01
Structure: Multi Span Structure
Ventilation System: Skylight Ventilation, Side Window Ventialtion
Reduce Temperature: Water Curtains, Exhaust Fan
Shade System: Outside Shade System, Inside Shade System
Span: 12m/10.8m/9.6m
Bay: 4m/8m
Eave High: 3m-6m
Load Wind: 0.45kn/M2
Trademark: sinobeacon
Transport Package: No Packing
Specification: hot dip galvanzied steel pipes
Origin: Qingzhou
HS Code: 9406900090
commercial greenhouse mainly for  north America area
commercial greenhouse mainly for  north America area